1. Crushing
  2. Pre-blending (Both circular and inline)
  3. Raw Grinding (VRM and Ball Mill)
  4. Coal Grinding (VRM and Ball Mill)
  5. Pyro Process with Low NOx Calciner.
  6. Advanced Fuel storage and firing system.
  7. Silo and Storage Yard and Dome
  8. Material handling complete equipment.
  9. Clinker Grinding Cement Mill (VRM and Ball Mill)
  10. Pre- Grinder circuit.
  11. Cement Cooling system.
  12. EP Filters and Bag House (< 10 mg/Nm3).

Design and compilation of the total plant with guaranteed lowest Specific Power and Thermal consumption compared to any other technology available in the Global cement Market.




Starts from the responsible citizen to dispose the garbage in 3 separate bins. MCD garbage Van picks the garbage separately to avoid a mix of

  1. Bio degradable
  2. Metals& Glass, Plastic, Rubber.
  3. Bio hazardous (Used batteries, electronic)

The waste is :

  • collected
  • Separated
  • Dried (RDF)
  • Transported
  • Stored
  • Dozing
  • Fired in the Cement Kiln & Calciner.

NOTE: This is one of the only economical way to reuse 100% waste without negatively effect to the atmosphere



Below are the list of projects that BQB is willing to take up as Turnkey:

  • Dismantling, Packing & Forwarding, Reassembly and Re-erection of any operation unit
  • Design, Engineering, Supply, Installation and Commissioning of Alternative Fuel Utilization System (Civil Engineering also included)
  • Close Circuiting of Ball Mill (Design, Engineering, Supply, Fabrication, Erection and Installation)
  • Conversion of ESPs to Bag House to control the emission <10 mg/Nm3
  • Upgrading the existing ESP to control the emission <10 mg/Nm3
  • Complete Plant

During Execution of Turnkey Projects, we ensure followings:

  • Project Planning
  • Professional Monitoring
  • Efficient Equipment Utilization
  • Trained Professional Project Team Deputation
  • Adhering to Full Safety Norms
  • Delivery in Time


Copyright ©2015 BQB Infra Technorium Pvt. Ltd. | Sitemap | Ad